Home > english-chinese > "progress schedule" in Chinese

Chinese translation for "progress schedule"

(生产等的)进度表
工程进度表
进度工作日程
进度计划
进度时间表


Related Translations:
percentage progress:  进度百分比
drilling progress:  钻进过程钻井进度;钻井的进展
progress dialog:  处理对话框进度对话框
progress management:  建造进度管理
economic progress:  经济发展经济进步
progress reports:  进度报告进展报告
intermittent progress:  间歇前进
progress monitoring:  进度控制
industrial progress:  工业进展
progress signal:  前进信号
Example Sentences:
1.Progress chart ; progress schedule
工程进度表
2.Quality requirements , cost control , progress schedule and execution supervision that the owner demands can be reflected in the lump - sum contract
业主对项目的质量要求、成本控制、时间进度、执行监督均在管理承包合同中体现
3.Real - time performance of the progress schedule is effectively improved by implementing ready queue and variable of the progress schedule in the embedded system developing platform
通过引入就绪队列、设置进程调度变量等方式,改进了嵌入式系统开发平台进程调度的实时性。
4.3 the supplier will submit to the company a supply progress schedule showing clearly the total number of sleeves planned to be in progress at any stage of the manufacturing process within the entire timeframe envisaged for completing the order
供应商将向公司提交一份供货进度表,明确说明在设想完成订单供货的整个时间框架内在任何制造工序上计划正在制造的套管总数量。
5.Based on detail analysis of process states and switch processes of the embedded system , the design principle of process scheduling is given , and the progress schedule of embedded system developing platform kernel layer is designed and realized
详细分析了嵌入式系统开发平台的进程状态及其转换过程,给出了进程调度思想,设计并实现了嵌入式系统开发平台核心层进程调度。
6.Before embedding of the foundation and embedment parts , technical clarificaiton will be don by the engineer in charge and the working group on the basis of design drawing 、 installation documentation 、 design amendment notification and supervision nofification 、 the principle of no impeded the progress schedule 、 the requirement of the relevant regulations and specification , setting out the embedment locaiton applied by the theodolite 、 water level and tape after that carrying on the embedment process and the record will be well kept
以设计图纸、设备安装资料及设计修改通知单和监理通知单为依据,按规程规范的要求,以不影响工程进度为原则,由主管工程师对施工班组进行技术交底,利用经纬仪、水准仪和卷尺等测量工具放点定位进行基础及预埋件预埋并做好预埋记录。
Similar Words:
"progress report (letter; sheet)" Chinese translation, "progress report progress sheet" Chinese translation, "progress reporting" Chinese translation, "progress reporting system" Chinese translation, "progress reports" Chinese translation, "progress sharing plan" Chinese translation, "progress sheet" Chinese translation, "progress signal" Chinese translation, "progress spacecraft" Chinese translation, "progress test" Chinese translation